Logo
Logo
  • Home
  • About Us
    • Our history
    • Our Team
    • Nationally-recognised training
  • Courses
    • Training Accreditation
    • Hyperbaric Worker’s Course
    • Lock Operator’s Course
    • Oxygen provision in hyperbaric accidents
    • First aid training
    • Workplace First Aid
    • Basic emergency life support
    • Hyperbaric tunnel worker’s medical
    • ADAS Trimix (normoxic)
    • Compressed Air Supervisor
  • Our projects
  • Products & Services
    • Oxygen Analysers
    • Breathing Air Analysis
    • Oxygen Intervention Kit
    • Gauge Calibration
    • Hyperbaric Tunnel Workers Handbook
    • Hyperbaric Workers Logbook
  • News
  • Contact

Hong Kong 1109 contract

    The Hong Kong MTR Shatin to Central project is 17 kl of rail line and includes 10 stations.

    Project Details

    The project has been divided into a number of separate contracts. The 1109 contract is for the Sung Wong Toi station to Kwa Wan Station which is two 6.5 meter internal diameter, segmentally lined, tunnels about 1950m long.

    The project will use two Herrenknecht 7.45m mix shield slurry TBMs working at a maxium pressure od 3.2 bar.

    The project is a Samsung Hsin Chong Joint Venture.